The Town Engineer is responsible for the development of internal engineering plans for capital improvement projects. This position is also responsible for the review and approval of private development plans and specifications. While the engineer does provide some level of construction oversight, this has been more of a function of the CIP Project Manager, who also facilitates the bidding process.
For permits, fees, and Engineering Design Standards, please see the resources below. These documents provide guidance to help ensure projects meet Town of Camp Verde requirements and are completed safely and efficiently.
Engineering Design Standards
Engineering Design StandardsEngineering Fee Schedule
Engineering Fee ScheduleEngineering Notes & Standard Details
Engineering Notes & Standard DetailsMAG Standards Specifications & Details
MAG Standards Specifications & DetailsDrainage Design Standards
Drainage Design StandardsCulvert Permit Application
Culvert Permit Application
Additional Climatic & Geographic Design Criteria:
- Wind Shear – Will be based on:
- Residential Construction 105 MPH – Exposure C (when designed using the 2024 IRC)
- Commercial Construction - MPH based on Risk Category (as defined by the 2024 IBC); Exposure C
- Seismic Design Category - C
- Weathering – Moderate
- Winter Design Temp – 20°. No ice barrier underlayment required
- Roof Snow Load – Calculate using ground snow load. No drift requirements.
- Ground Snow Load - 20 LBS
- Termite – Moderate to Heavy
- Drainage – 4 inches per hour
- Frost Depth – 12 inches
- Flood Hazards – Refer to Floodplain Unit of Yavapai County
- Air Freezing Index – 194
- Mean Annual Temp – 53°
- Climate Zone - 2B